As a local public works agency headquartered in Columbus, Ohio, the Franklin County Engineer's Office is responsible for the maintenance and construction of 271 miles of county roadway and 351 county bridges, as well as upkeep of all county ditches, drains, retention basins, and other storm water facilities within the right-of-way of county roads in unincorporated areas. To meet the continuing development and infrastructure needs of Franklin County, the Engineer's Office utilizes the latest technologies for determining and maintaining roadway centerlines and boundaries; retracing and setting new monuments for original public land surveys; preparing geographic information system mapping for real estate tax assessments; and establishing precise countywide horizontal and vertical control to maintain uniformity in construction, surveying, and mapping.
Franklin County Engineer
Franklin County Engineer
Our offices are closed today in observance of Independence Day. We hope you enjoy the day with friends and loved ones! We will reopen Monday, July 7, 2025, at 7:00 a.m.
Franklin County Engineer
Franklin County Engineer
The 2025 Township Resurfacing Program is underway across participating townships. While overall work areas are set, activity within each location may vary based on the scope of work and weather conditions. Please drive with caution in work zones and follow posted signage. Thank you for your patience as we work to improve the roads in your community!
Franklin County Engineer
Franklin County Engineer
Beach Road, west of Amity Road, will be closed beginning Monday, July 7, 2025, for bridge maintenance work. The closure will last approximately ninety (90) days, weather permitting.
Franklin County Engineer
Franklin County Engineer
The Franklin County Engineer’s Office had a blast at this morning’s WABA - Westland Area Business Association Independence Day Parade! It was great to see so many smiling faces and celebrate with the community ahead of the holiday. Thanks for the warm welcome. We love being part of this tradition!
Franklin County Engineer
Franklin County Engineer
Leppert Road, between Hayden Run Road and Scioto Darby Road, is now open to traffic.
Franklin County Engineer
Franklin County Engineer
The road closure for bridge rehabilitation work on Harrisburg-Georgesville Road over Big Darby Creek, between London-Groveport Road and Opossum Run Road, initially scheduled to begin Monday, June 30, 2025, has been delayed to Monday, July 7, 2025. The closure will last approximately one-hundred eighty (180) days, weather permitting.
Franklin County Engineer's Office
970 DUBLIN ROAD
COLUMBUS, OHIO 43215
(614) 525-3030
fracoeng@franklincountyengineer.org

Follow Us

Top
 

Future Projects

Future Projects

2025

2025 Spring Programmatic Consultant Open House
2025 Franklin County Resurfacing Program
Resurfacing
2025 Township Resurfacing Program
Resurfacing
Brobst Park Drainage Outlet
Drainage Improvement
Beach Road 0.00 over Big Darby Creek
Bridge Improvement
Case Road Area Storm Sewer Replacement
Highway Improvement
Cosgray Road and Faust Ditch Drainage Improvements
Drainage Improvement
Darling Road Drainage Improvements
Drainage Improvement - Force Account
Eiterman Road 0.75 over South Fork Indian Run
Bridge Improvement
Harrisburg-Georgesville Road 2.83 over Big Darby Creek
Bridge Improvement
Kropp Road Drainage Outlet
Drainage Improvement
Leppert Road ( Heritage Trail to Davidson Road)
Roadway Improvement
Mando Ditch Improvement
Ditch Improvement
Marlane Drive 0.67 over Marsh Run
Bridge Improvement
Norwich Township Safety Building Parking Lot Phases 2, 3 and 4
Parking Lot Replacement
ODOT - Argabright Ditch Improvement
Ditch Improvement
Old Haughn Road 1.59 over Holton Run
Bridge Improvement
Pontius Road 1.50 over Tributary of Little Walnut Creek
Bridge Improvement
Raduege-Snyder Ditch
Ditch Improvement
Roberts Road 4.68 over Clover Groff
Bridge Improvement
Roberts Road 0.64 over Morris Ditch
Bridge Improvement
Safe Routes to School 2022
Sidewalks & ADA ramp installation project
West North Broadway 1.18 over Olentangy River
Bridge Improvement
Winchester Pike 2.40 over Coble & Bowman Ditch
Bridge Improvement
Zuber Road / Plum Run Drainage
Drainage Improvement