As a local public works agency headquartered in Columbus, Ohio, the Franklin County Engineer's Office is responsible for the maintenance and construction of 271 miles of county roadway and 351 county bridges, as well as upkeep of all county ditches, drains, retention basins, and other storm water facilities within the right-of-way of county roads in unincorporated areas. To meet the continuing development and infrastructure needs of Franklin County, the Engineer's Office utilizes the latest technologies for determining and maintaining roadway centerlines and boundaries; retracing and setting new monuments for original public land surveys; preparing geographic information system mapping for real estate tax assessments; and establishing precise countywide horizontal and vertical control to maintain uniformity in construction, surveying, and mapping.
This morning, Engineer Fowler and #TeamFCEO hosted our Intern and Summer Help Networking Event where participants had the opportunity to connect with one another and hear from FCEO staff as they shared their diverse career paths, including a wide range of disciplines and professional experiences prior to joining FCEO. It was a valuable morning of learning, conversation, and inspiration. We’re proud to invest in the next generation entering the workforce as they explore meaningful and rewarding career paths.
The Franklin County Fair kicks off Monday, July 14, 2025. Join us on opening day for County Engineer Adam W. Fowler Day! Bring your family and friends to celebrate, help us paint a snowplow, and enjoy hands-on fun for all ages. We can’t wait to see you there!
Harrisburg-Georgesville Road over Big Darby Creek, between London-Groveport Road and Opossum Run Road, is closed for bridge rehabilitation work. The closure will last approximately one-hundred eighty (180) days, weather permitting.
Eiterman Road over South Fork Indian Run, between Post Road and Bobcat Way, will be closed beginning Monday, July 14, 2025, to replace and widen the existing bridge to accommodate the future build-out of the Dublin throughfare plan. The closure will last approximately ninety (90) days, weather permitting.
Winchester Pike over Coble & Bowman Ditch, between Shannon Road and Bachman Road, will be closed beginning Monday, July 14, 2025, to widen the roadway and replace the existing culvert. The closure will last approximately sixty (60) days, weather permitting.